Computer software, test-curve display and Excel/PDF output are available within Derui’s furniture-testing equipment range. Confirm the measured quantities, curve types, retained records and report fields for the selected machine and software version. The included functions should match the test task and be identified in the quotation; they are not proof that every model measures the same quantities.
Describe the Record Your Laboratory Needs
Start with the result and traceability required by your procedure: specimen identity, setup, relevant force or displacement values, cycle count, observations and any before-and-after measurements. Not every task needs the same record, and not every machine measures each quantity.
If curves or time-dependent measurements are required, discuss the actual measuring chain and acquisition requirements. Controller scan time, a stated sampling rate and sensor bandwidth describe different aspects; one headline number does not establish that a transient force is measured adequately.
Review Functions Against the Quotation
| Function | What to check in the actual configuration |
|---|---|
| Display and storage | Which values are only shown and which are retained with the specimen and settings. |
| Curves and calculations | The measured quantities, required calculation and an actual example where available. |
| Report and export | Included fields, units, file formats and whether raw readings can be retained when needed. |
| Interruption handling | What is saved, what requires manual recovery, and how an interrupted run is identified. |
| Integration and access | Any agreed interface, access permissions, licence or additional development; not assumed standard. |
Inspect an Output Before Approval
Where a shareable sample is available, compare its fields with your own procedure. Confirm the equipment and software identity, units, specimen identification and the connection between settings and results. An example screen is not evidence that every model includes the same functions.
An automatic pass/fail label depends on the configured criteria and completed scope. It is not, by itself, product certification or laboratory accreditation. Data integrity and retention also depend on the laboratory workflow, access and backup arrangements; they should not be reduced to a blanket guarantee.
Use the quotation scope checklist and measurement verification checklist when reviewing the system.



